Hello,
of course during a project phase the attributes of a BO node are enhanced/changed. If already an OData Service was created, the changes are not reflected in the service. I tried to do the same steps in SEGW as for the original generation, but I can only create a new version of the service.
Is there an option to overwrite the existing service (without deleting it manually before)?
Thx,
Florian